| Filename | Latest commit message | Latest commit date |
|---|---|---|
|
All checks were successful
Repository checks / repository-baseline (push) Successful in 24m14s
The project brief still describes the Connect entry as proposed after its protected integration and verified publication. Record the actual PR 29 decision, Run 14 publication and bounded public-only AI reading exercise in an additive dated continuation. Preserve the original Proposed exports and identify one draft-only non-software project brief as the next step. Validation: repository baseline, boundary/history, whitespace, public links and original-export identity checks pass. The generated static payload remains unchanged. Independent final review accepted the exact head with no actionable findings. Native required CI remains the integration gate. |
||
| .. | ||
| website-connect-entry-2026-10-17.json | ||
| website-connect-entry-2026-10-17.md | ||
| website-connect-entry-2026-10-18-decision.md | ||