Record accepted Connect contribution and next project step #30

Merged
ClaudiuSchuster merged 1 commit from oss-oo/website-contribution-closure-docs-20261018 into main 2026-10-18 02:41:08 +00:00
Owner

The project brief still describes the Connect entry as proposed after its protected integration and verified publication. Record the actual PR 29 decision, Run 14 publication and bounded public-only AI reading exercise in an additive dated continuation. Preserve the original Proposed exports and identify one draft-only non-software project brief as the next step.

Validation: repository baseline, boundary/history, whitespace, public links and original-export identity checks pass. The generated static payload remains unchanged. Independent final review accepted the exact head with no actionable findings. Native required CI remains the integration gate.

The project brief still describes the Connect entry as proposed after its protected integration and verified publication. Record the actual PR 29 decision, Run 14 publication and bounded public-only AI reading exercise in an additive dated continuation. Preserve the original Proposed exports and identify one draft-only non-software project brief as the next step. Validation: repository baseline, boundary/history, whitespace, public links and original-export identity checks pass. The generated static payload remains unchanged. Independent final review accepted the exact head with no actionable findings. Native required CI remains the integration gate.
Record Connect contribution acceptance and continuation
All checks were successful
Repository checks / repository-baseline (pull_request) Successful in 24m53s
dcf32e2eba
ClaudiuSchuster changed title from WIP: Record accepted Connect contribution and next project step to Record accepted Connect contribution and next project step 2026-10-18 02:15:40 +00:00
ClaudiuSchuster deleted branch oss-oo/website-contribution-closure-docs-20261018 2026-10-18 02:41:08 +00:00
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
OSS-Singularity/website!30
No description provided.